Skip to content

Opportunity overview

Active Federal PPRA / EPADS Official source

Re-Verification of 04Nos. Calibrated Fuel Storage Tanks for Diesel Generators at SBP BSC Faisalabad

SBP BSC Faisalabad (SBP Banking Services Corporation (BSC))

Reference: P165702

Tender information

Published
Submission deadline
Not specified
Procurement method
Request for Quotation
Procuring agency
SBP BSC Faisalabad (SBP Banking Services Corporation (BSC))
Location
Faisalabad , Punjab

Tender description

  • Re-Verification of 04Nos. Calibrated Fuel Storage Tanks for Diesel Generators at SBP BSC Faisalabad
  • Re-verification and Calibration of existing 5735 Liter Tank 01 (Rectangular Shaped ) Prover by Withdraw Method complete in accordance with API MPMS Chapters 4.7 & 12.2.4, EURAMET cg-21 and ISO/IEC 17025, including mobilization, site inspection, clean
  • Re-verification and Calibration of existing 844 Liter Tank 02 (Rectangular Shaped ) Prover by Withdraw Method complete in accordance with API MPMS Chapters 4.7 & 12.2.4, EURAMET cg-21 and ISO/IEC 17025, including mobilization, site inspection, cleani
  • Re-verification and Calibration of existing 955 Liter Tank 03 (Vertical Cylindrical Shaped) Prover by Withdraw Method complete in accordance with API MPMS Chapters 4.7 & 12.2.4, EURAMET cg-21 and ISO/IEC 17025, including mobilization, site inspection
  • Re-verification and Calibration of existing 5662 Liter Tank 04 (Horizontal Cylindrical Shaped) Prover by Withdraw Method complete in accordance with API MPMS Chapters 4.7 & 12.2.4, EURAMET cg-21 and ISO/IEC 17025, including mobilization, site inspect

Technical Specifications

Re-Verification of 04Nos. Calibrated Fuel Storage Tanks for Diesel Generators at SBP BSC Faisalabad View Proposed BoQ — Re-Verification of 04Nos. Calibrated Fuel Storage Tanks for Diesel Generators at SBP BSC Faisalabad

Specification
Re-verification and Calibration of existing 5735 Liter Tank 01 (Rectangular Shaped ) Prover by Withdraw Method complete in accordance with API MPMS Chapters 4.7 & 12.2.4, EURAMET cg-21 and ISO/IEC 17025, including mobilization, site inspection, cleaning (if required), provision of certified and traceable reference standards, calibrated instruments, recording of tank identification, construction material, dimensions (OD, ID & WT), upper and lower neck scale (SRu & SRl), ambient and tank temperatures, pressure and all required field observations, execution of complete withdrawal sequence, application of all applicable correction factors, complete calibration calculations, determination of Base Prover Volume (BPV) and Calibrated Prover Volume (CPV), repeatability verification (≤0.020%), adjustment of neck scale where required, re-calibration, resealing of SRu, SRl, displacement tube and all adjustable components, submission of raw observation sheets, calculation worksheets, uncertainty statement, traceable calibration certificate, reference standard certificates, calibration labels and all labour, supervision, tools, tackles, transportation, consumables and incidental works complete in all respects. Job
Specification
Re-verification and Calibration of existing 844 Liter Tank 02 (Rectangular Shaped ) Prover by Withdraw Method complete in accordance with API MPMS Chapters 4.7 & 12.2.4, EURAMET cg-21 and ISO/IEC 17025, including mobilization, site inspection, cleaning (if required), provision of certified and traceable reference standards, calibrated instruments, recording of tank identification, construction material, dimensions (OD, ID & WT), upper and lower neck scale (SRu & SRl), ambient and tank temperatures, pressure and all required field observations, execution of complete withdrawal sequence, application of all applicable correction factors, complete calibration calculations, determination of Base Prover Volume (BPV) and Calibrated Prover Volume (CPV), repeatability verification (≤0.020%), adjustment of neck scale where required, re-calibration, resealing of SRu, SRl, displacement tube and all adjustable components, submission of raw observation sheets, calculation worksheets, uncertainty statement, traceable calibration certificate, reference standard certificates, calibration labels and all labour, supervision, tools, tackles, transportation, consumables and incidental works complete in all respects. Job
Specification
Re-verification and Calibration of existing 955 Liter Tank 03 (Vertical Cylindrical Shaped) Prover by Withdraw Method complete in accordance with API MPMS Chapters 4.7 & 12.2.4, EURAMET cg-21 and ISO/IEC 17025, including mobilization, site inspection, cleaning (if required), provision of certified and traceable reference standards, calibrated instruments, recording of tank identification, construction material, dimensions (OD, ID & WT), upper and lower neck scale (SRu & SRl), ambient and tank temperatures, pressure and all required field observations, execution of complete withdrawal sequence, application of all applicable correction factors, complete calibration calculations, determination of Base Prover Volume (BPV) and Calibrated Prover Volume (CPV), repeatability verification (≤0.020%), adjustment of neck scale where required, re-calibration, resealing of SRu, SRl, displacement tube and all adjustable components, submission of raw observation sheets, calculation worksheets, uncertainty statement, traceable calibration certificate, reference standard certificates, calibration labels and all labour, supervision, tools, tackles, transportation, consumables and incidental works complete in all respects. Job
Specification
Re-verification and Calibration of existing 5662 Liter Tank 04 (Horizontal Cylindrical Shaped) Prover by Withdraw Method complete in accordance with API MPMS Chapters 4.7 & 12.2.4, EURAMET cg-21 and ISO/IEC 17025, including mobilization, site inspection, cleaning (if required), provision of certified and traceable reference standards, calibrated instruments, recording of tank identification, construction material, dimensions (OD, ID & WT), upper and lower neck scale (SRu & SRl), ambient and tank temperatures, pressure and all required field observations, execution of complete withdrawal sequence, application of all applicable correction factors, complete calibration calculations, determination of Base Prover Volume (BPV) and Calibrated Prover Volume (CPV), repeatability verification (≤0.020%), adjustment of neck scale where required, re-calibration, resealing of SRu, SRl, displacement tube and all adjustable components, submission of raw observation sheets, calculation worksheets, uncertainty statement, traceable calibration certificate, reference standard certificates, calibration labels and all labour, supervision, tools, tackles, transportation, consumables and incidental works complete in all respects Job
Specification

Official source

Always confirm dates, documents, and submission instructions on the originating portal.

View original tender on Federal PPRA / EPADS